Do this the entire slope along the length of the panel. Apply continuous pressure on overlap rib so as to snap it down over the under-lap rib. Starting at the eave, apply pressure to the overlap rib until it locks into position. Engage 6” to 12” of the overlapping rib and slide the panel open hem over the nose of the eave flashing. Position the next panel over the under-lap leg. Clips should be spaced a maximum of 24” c/c apart, and may require closer spacing over solid decking.
#Fabral spokane install
Install the 1-1/2” SSR clips at the required spacing along the lengths of the panel, using two (2) #10x1” Pancake woodfast screws in each clip. Apply tape caulk and place sliding gable cleat over overlap edge and screw down the gable cleat.Ħ. Starting at the gable end, install the first 1-1/2” SSR panel parallel to the gable with the overlap edge along the gable. REMOVE the clear strippable film on the painted side of the overlap rib before installing!ĥ. Use One-Part Polyurethane sealant on this portion of the rib to provide a weather tight seal. Trim and fold overlap rib of panel to provide a clean closed panel rib appearance. Rib flush with the hem edge of the panel pan. Notch eave of panel 1” and bend the hem under by using the hem-bending tool. Install specified underlayment (such as a minimum 30# felt, Pro-Master UDL, and/or “Ice and Water Shield”).ģ. 9/16 OSB or wafer board decking can be used with reduced clip spacing. Typically a minimum 1/2” plywood or 2x4 furring is used as support for the 1-1/2” SSR metal roof system. Solid decking is recommended to help reduce oil canning and for all residential applications. Check the support system or roof deck to be sure all supports are installed straight, square and in. Smeared caulking can be removed from the roof with mineral spirits and a soft cloth.

This caulking may not be visible within 6” of the end of the panels, but can be found inside the overlap rib. Note 3: All panels are factory caulked with a 1/8” bead of butyl sealant in the overlapping rib. With any metal roof system vented soffits, gable vents, and/or ridge vents can be used as part of the overall design. Ventilation design is not the responsibility of FABRAL. Note 2: Proper design for attic ventilation for the particular building is the responsibility of the designer,engineer or homeowner, and should comply with local codes. Lead and copper are corrosive when usedwith galvanized steel. PRE-Installation:Note 1: Lead and copper flashings from existing chimneys, skylights, endwalls and other areas must beremoved prior to installation of the new galvanized 1-1/2” SSR. Panel Specs:Substrate: Acrylic Coated Galvalume® SteelWeight = 130 lbs/sqMinimum Slope: 1:12Lengths: Minimum 7” Maximum 47’6”Panel does NOT endlap- contact Fabral about long length roof runs Since each project is unique, the information is intendedto be used as a guideline and in no way insures proper application of the 1-1/2” SSR. The information in this booklet has been prepared to assist the designer and installer with the properapplication of FABRAL’s 1-1/2” SSR roof system.